EV charging

EV charging, from the garage to the fast-charge lot.

Level 2 chargers for homes and workplaces, and DC fast charging for cities, fleets and businesses. We handle the electrical service, trenching, equipment and utility coordination ourselves.

DC fast charger behind yellow bollards charging an electric car, with a second charger behind it
DC fast charging · Mustang City Hall

Who it’s for

Homes, fleets and public charging.

  • Homeowners adding a Level 2 charger in the garage or driveway
  • Cities, counties and tribes building public or fleet charging
  • Businesses adding workplace or customer charging
  • Sites that want to pair charging with solar and batteries

How we build it

What we do differently.

01

Check the service first

Most problems with EV chargers come from an overloaded panel. We run a load calculation and use load management or a service upgrade when it’s needed.

02

Self-performed site work

Trenching, conduit, pads, bollards, distribution equipment and medium-voltage coordination are done by our own crew, not passed to another subcontractor.

03

Utility and permit coordination

Fast chargers usually need a new or upgraded utility service. We work the application with the utility and the permit with the city.

04

Commissioned and handed off

Chargers are set up on their network, tested and turned over with documentation.

What it costs

Real prices, not “call for a quote.”

Home Level 2 installs depend mostly on the distance from your panel and whether the panel has room. Commercial and DC fast-charging projects are quoted individually after a site visit.

Tell us about the site and we’ll come back with a real number.

Our work

Projects like this.

Row of pedestal-mount Level 2 EV chargers with yellow bollards and an Electric Vehicle Parking Only sign

Oklahoma City, OK · EV charging

City of Oklahoma City Street Maintenance Facility

DC fast charging
1 × 150 kW
Level 2
4 × 7.7 kW
Completed
Jul 2025

A 150 kW DC fast charger and four 7.7 kW pedestal-mount Level 2 chargers at the city’s Street Maintenance Facility, with the service equipment, trenching and bollards.

See all projects →

Questions

Straight answers.

Do I need a panel upgrade for a home charger?

Not always. Many 200 A services can handle a 40 or 48 A charger, and load-management devices can avoid an upgrade. We check with a load calculation before you buy anything.

How long does a DC fast-charging project take?

The install itself is usually a few weeks. The longest step is often the utility service upgrade, so we start that application early.

Can chargers run on solar?

Yes. Solar offsets the energy over time, and batteries can cut demand charges on commercial sites. We design both together when it makes sense.

Tell us what you need it to do.

We’ll design and price a system that does exactly that. No pressure, no upsell.