NEBO (Net Energy Billing Option)
Solar and usage are netted over each monthly bill, separately for on-peak and off-peak hours, on a required time-of-use rate. Only a monthly surplus is credited, at avoided cost.
- Export credit
- Monthly surplus only: 30-day average SPP market price at the OG&E node, on-peak and off-peak. OG&E does not publish a monthly table.
- Size limit
- 300 kW, and no more than 125% of your last 12 months’ peak demand
- Fees
- No solar-specific fee. Customer charge, riders and taxes still apply. Must be on a standard time-of-use rate.
Credits carry forward; payout available once over $100 or after 24 months. OG&E filed a rate case on 9/30/2026 (PUD 2026-000067) that could change these terms.
NEBO (Net Energy Billing Option)
Solar and usage are netted over each monthly bill, separately in on-peak and off-peak time-of-day buckets. Net usage is billed at your time-of-day rate; a monthly surplus is credited at avoided cost on the next bill.
- Export credit
- Monthly surplus only: SPP market average, e.g. 4.20¢ on-peak / 3.62¢ off-peak per kWh (July 2026)
- Size limit
- 300 kW, and no more than 125% of annual peak demand
- Fees
- No solar-specific fee. Must be on a standard time-of-day rate. Non-fuel riders apply to all delivered kWh.
Requires a separate production meter. Alternative: sell output under PSO’s QF schedule (4.17¢ firm / 3.19¢ non-firm per kWh). Credits carry forward; payout over $100 or after 24 months.
Optional Net Energy Billing (Schedule NEB)
One meter runs backward and is netted each month. Net usage is billed at retail; a monthly surplus is credited at avoided cost and carried forward.
- Export credit
- Monthly surplus only: avoided energy cost (about 1.8–1.9¢/kWh plus the monthly fuel adjustment)
- Size limit
- 300 kW, and no more than 125% of peak load
- Fees
- Monthly customer charge always applies.
- Serves
- Ottawa counties
Serves a small area of far northeast Oklahoma.
Policy 511, Distributed Generation
- Fees
- Minimum monthly service charge applies.
- Serves
- Alfalfa, Woods, Grant, Garfield, Major counties
We could not find a published solar policy. Call the co-op, or ask us and we will check during design. (580) 596-3333.
- Serves
- Le Flore, Sequoyah counties
Arkansas members follow Arkansas net-metering rules; we found no Oklahoma-specific terms. Call 1-800-468-2176.
Net-metered solar account
Solar offsets usage over the billing period; CVEC buys back any surplus at its power supplier’s avoided cost.
- Export credit
- Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
- Size limit
- Short-form agreement up to 50 kW and 125% of peak load
- Fees
- Facilities charge on every meter. New residential demand charge ($1/kW in 6–9 am and 3–7 pm windows) since November 2025.
- Serves
- Seminole, Pottawatomie, Okfuskee, Hughes, Pontotoc, Lincoln, Okmulgee counties
Solar members connected by 11/1/2025 keep the old rate structure for 5 years. Requires a lockable disconnect within 10 ft of the meter.
Distributed Generation Rider
The meter runs backward and is settled each month (no annual rollover). A monthly surplus is credited at the power supplier’s avoided cost.
- Export credit
- Power supplier’s avoided cost (no number published)
- Size limit
- Net metering up to 300 kW; over 125% of peak load may be paid avoided cost only
- Fees
- Application fee; possible facilities charge; member pays for the remote-read link.
- Serves
- Payne, Logan, Lincoln, Noble, Pawnee, Creek, Oklahoma counties
Rider effective 12/31/2025. A separate “Power Export” option covers 25 kW–3 MW.
Distributed Generation Rider 710
No netting. Solar offsets only what the home is using at that moment; exports are measured separately and credited at avoided cost.
- Export credit
- Avoided cost set by the co-op (wholesale rate plus a renewable credit component; no number published)
- Size limit
- Under 1 MW and no more than 125% of peak load
- Fees
- Application fee and possible facilities charges.
- Serves
- Choctaw, McCurtain, Pushmataha counties
Applies to agreements signed on or after 9/26/2023. Older systems under 25 kW keep monthly netting (Rider 710.1) until 2033 at the latest, with surplus given to the co-op.
Policy 407, Distributive Generation Rider
The meter runs backward and is netted each month. A monthly surplus is credited at the power supplier’s avoided energy cost.
- Export credit
- Power supplier’s avoided cost (no number published)
- Size limit
- 300 kW and no more than 125% of peak load
- Fees
- $15/month DG meter charge. No application fee under 300 kW (engineering fees possible).
- Serves
- Kingfisher, Canadian, Blaine, Logan, Garfield, Major counties
Rate 710, Distributed Generation
Solar up to the month’s usage is credited at the regular energy rate. Any monthly surplus is paid at a fixed excess rate on the next bill.
- Export credit
- 3.7¢/kWh fixed (Feb 2023 manual; reviewed yearly)
- Size limit
- 300 kW (larger case by case)
- Fees
- Application fee $175 (≤25 kW) or $275 (26–100 kW). Metering charge $20/month (≤25 kW) or $50/month (>25 kW).
- Serves
- Caddo, Kiowa, Washita, Custer, Grady, Canadian, Blaine, Comanche counties
Requires a second (production) meter; installer supplies the meter base.
- Serves
- Haskell, Sequoyah, Muskogee, McIntosh, Cherokee, Le Flore, Pittsburg, Adair counties
We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 1-800-328-2368.
Distributed Generation Guidelines
No net metering for any size. Solar offsets usage only as it happens; everything bought from the co-op is retail, and exports are credited monthly at avoided cost.
- Export credit
- Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
- Size limit
- 300 kW and no more than 125% of peak load
- Fees
- Application fee $100 (under 300 kW) plus engineering; possible facilities and monthly DG charges.
- Serves
- Cotton, Comanche, Stephens, Jefferson, Tillman, Grady, Caddo, Kiowa, Carter counties
Requires separate production metering. The application asks for battery details (AC/DC coupling, transfer switch, protected-load panel).
Distributed Generation Rider
The meter runs backward and is netted each month. A monthly surplus is bought at the power supplier’s avoided cost.
- Export credit
- Avoided cost (3.66¢/kWh when approved in Jan 2023; current value not published)
- Size limit
- 300 kW and no more than 125% of peak load
- Fees
- Application fee: none under 5 kW, $50 for 5–100 kW. $5.83 per meter per month.
- Serves
- Okmulgee, Muskogee, Creek, Okfuskee, McIntosh, Wagoner, Tulsa, Hughes, Pittsburg counties
Battery backup requires a parallel blocking scheme.
- Serves
- Harmon, Greer, Jackson, Kiowa, Beckham counties
We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 580-688-3342.
Distributed Generation Rider
Up to 25 kW, the meter runs backward and a monthly surplus is bought at avoided cost. Over 25 kW there is no netting: usage is billed at retail and exports are bought at avoided cost.
- Export credit
- Power supplier’s avoided cost (no number published)
- Size limit
- Net metering only up to 25 kW; rider covers up to 3 MW
- Fees
- $25/month customer charge over 25 kW; possible facilities charge and meter-read charge.
- Serves
- Pawnee, Osage, Creek, Tulsa, Payne, Noble counties
- Fees
- Minimum monthly fee applies.
- Serves
- Kay, Grant, Noble, Osage, Garfield counties
We could not find a published solar policy. Call the co-op, or ask us and we will check during design. (580) 363-1260.
Distributed Generation Rider DG900
The meter runs backward and is netted each month. A monthly surplus is bought at the power supplier’s avoided cost. Systems over 125% of peak load sell all output at avoided cost.
- Export credit
- Power supplier’s avoided cost (no number published)
- Size limit
- 300 kW and no more than 125% of peak load
- Fees
- DG facilities charge of $3.11 per kW of nameplate per month, on top of the regular facility charge.
- Serves
- Latimer, Pittsburg, Le Flore, Pushmataha, Atoka, Haskell counties
Battery storage counts as a qualifying facility. Member pays for the remote-read link.
Distributed Generation Rider (systems connected on or after 1/1/2018)
No net metering. Usage is billed as if there were no solar, and power sent to the grid is paid at the power supplier’s avoided cost.
- Export credit
- KAMO Power avoided cost (no number published)
- Size limit
- 100 kW (larger case by case)
- Fees
- Application fee $25 (under 25 kW) or $50, plus engineering; $5/month if the meter must be read manually.
- Serves
- Cherokee, Wagoner, Muskogee, Mayes, Delaware, Adair counties
Systems connected before 2018 keep the older monthly-netting rider. Wagoner County requires a building permit number.
Net Metering
A two-way meter nets usage and solar over the billing month. If you produce more than you use, the energy charge is $0 and the surplus is credited at that month’s avoided cost.
- Export credit
- Published monthly: 9.34¢/kWh for Sept 2026 (2.7–5.8¢ most months of 2025–26)
- Size limit
- 300 kW, and under 125% of recorded peak demand
- Fees
- Regular monthly service charge always applies. No solar-specific fee listed.
- Serves
- Craig, Delaware, Ottawa, Mayes, Nowata, Rogers counties
DG Rider (effective 9/1/2020)
Reported (2020) to use either net metering or avoided-cost purchase, depending on system size compared with your peak load. Current tariff not confirmed.
- Export credit
- Likely WFEC avoided cost (2.68¢/kWh for Oct 2026)
- Size limit
- 300 kW (reported)
- Serves
- Beckham, Roger Mills, Washita, Custer, Greer counties
We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 580-928-3366.
Distributed Generation Guidelines
A net meter is installed after inspection, and any overage is calculated monthly and paid at the current avoided cost.
- Export credit
- Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
- Fees
- None listed beyond the standard monthly charge.
- Serves
- Woodward, Harper, Ellis, Woods, Major, Dewey counties
Approval required before installing; engineering review and meter exchange before permission to operate. Also offers community solar shares.
Interconnection of Distributed Generation
Up to 25 kW, the meter runs backward and is netted each month at retail. Over 25 kW there is no netting: usage is billed at retail and exports are paid at the power supplier’s avoided cost.
- Export credit
- Over 25 kW: WFEC avoided cost (2.68¢/kWh for Oct 2026)
- Size limit
- Net metering up to 25 kW; larger systems up to 3 MW without netting
- Fees
- Application fee $25 (under 5 kW), $50 (5–100 kW) plus engineering; possible monthly charge over 25 kW.
- Serves
- Cleveland, Oklahoma, McClain, Pottawatomie, Grady, Canadian counties
Based on OEC’s 2021 manual; confirm it is still current.
Net Metering (systems installed after 9/29/2024)
Usage is billed at retail and each exported kWh is credited at avoided cost as a dollar credit that rolls over.
- Export credit
- Avoided cost of energy (filed yearly; no number posted)
- Size limit
- Under 1,000 kW
- Serves
- Adair, Cherokee, Delaware counties
Batteries must charge only from the solar and cannot export. Oklahoma members follow the same rules as Arkansas members.
Solar and usage are netted over each monthly bill. A monthly surplus is credited at avoided cost.
- Export credit
- Monthly surplus only: avoided cost, credited to your account (paid by check on request). Rate not published; for reference, power supplier WFEC's was 2.68¢/kWh for Oct 2026.
- Size limit
- 300 kW, and no more than 125% of the location's highest historical demand
- Fees
- $100 application fee. No monthly solar fee and no separate DG meter.
- Serves
- Pontotoc, Seminole, Hughes, Coal, Johnston, Garvin, Murray, Pottawatomie counties
Requires a signed interconnection agreement, PEC approval and inspection, and a disconnect switch. Batteries aren't addressed in the policy: no export during outages; otherwise exporting is allowed, with the design subject to PEC approval. Interconnection contact: Buddy Wright, Director of Construction Design & Reliability, (580) 272-1556. Confirmed by email from PEC, Nov 9, 2026.
Policy 602, Interconnection of Distributed Resources
Systems are net metered over the month; a monthly surplus is credited at avoided cost.
- Export credit
- Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
- Size limit
- 300 kW and no more than 125% of peak load; 50 kW and up moves to a standby rate
- Serves
- Love, Marshall, Carter, Bryan, Johnston, Jefferson counties
Monthly kWh netting; a surplus carries forward, and $100+ of credit within 24 months can be paid out at avoided cost.
- Export credit
- Avoided cost on payouts only (no number posted)
- Serves
- Le Flore counties
Published terms are Arkansas rules; confirm Oklahoma terms at 479-394-4140.
- Serves
- Garvin, Grady, McClain, Stephens, Murray counties
We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 405-756-3104.
2026 Distributed Generation Rider
- Serves
- Bryan, Marshall, Atoka, Johnston, Choctaw counties
A new 2026 rider is posted but we could not read it yet. 580-924-2170.
Non-Legacy Net Metering Tariff
Usage and exports are metered separately; each exported kWh is credited in dollars at avoided cost.
- Export credit
- 12-month average market price, reset each February (no number posted)
- Fees
- $320 one-time fee for inverter systems 25 kW and under.
- Serves
- McCurtain counties
Published terms are Arkansas rules; Oklahoma terms not confirmed.
Distributed Generation Rider (Part VII, effective 5/1/2019)
No net metering. Everything you buy from SWRE is billed at your normal rate; power you send to the grid is credited on your bill at the power supplier’s avoided cost.
- Export credit
- Power supplier (WFEC) avoided cost, set periodically — 2.68¢/kWh for Oct 2026
- Size limit
- Under 3 MW. Systems over 25 kW also need a purchased power contract with SWRE’s power supplier.
- Fees
- 25 kW and under: $10.92/month facilities charge; for General Service-eligible members, a minimum bill of at least $60/month. Member provides the communications link for remote meter reading; possible case-by-case facilities charge.
- Serves
- Tillman, Jackson, Kiowa, Comanche, Cotton, Greer, Harmon counties
Confirmed by SWRE by email on 11/4/2026, with the rider and interconnection contract. Systems 25 kW and under installed before 10/1/2015 keep legacy monthly net metering with excess given to the co-op. Interconnection contract required (long form above 5 kW). Contact: Barry Holt through January 2027, then Austin Huff (austinh@swre.com). Main office 580-667-5281.
Distributed Generation Program
Solar offsets what you are using at the time. Exports recorded on a two-way meter are credited at avoided cost, not netted at retail.
- Export credit
- Monthly regional market price from Golden Spread (no number posted)
- Size limit
- 1–300 kW, no larger than your service capacity
- Fees
- $250 co-generation meter installation; member pays for required protective equipment.
- Serves
- Texas, Beaver, Cimarron counties
Systems connected before June 1, 2017 keep their old agreement until 2029.
Rate 35, Small Power Producers
Up to 25 kW, the meter runs backward and is netted each month; a surplus is credited at avoided cost. Over 25 kW there is no netting: exports are bought at avoided cost.
- Export credit
- KAMO Power avoided cost (no number published)
- Size limit
- Net metering up to 25 kW and under 125% of peak; Rate 35 covers up to 300 kW
- Fees
- Customer charge still applies; $25/month if read manually; producer pays for meters.
- Serves
- Tulsa, Rogers, Osage, Washington, Nowata, Pawnee counties
- Serves
- Jackson
No published solar policy found.
- Serves
- Payne
No published solar policy found.
- Serves
- Kingfisher
Permit and inspection required; panels must be on the roof of a building owned by the electric customer (no ground mounts or street-visible yards). Export credit not published.
- Serves
- Sequoyah
No published solar policy found. 918-775-6241.
Rate Schedule RE, Net Metering and Distributed Generation
A two-way meter nets energy over the billing period. If you produce more than you use, you pay only the customer charge; the excess is not purchased.
- Export credit
- None. Monthly excess is not purchased.
- Size limit
- 95 kW per location; program closes when total city solar reaches 995 kW.
- Fees
- Processing fee $100 (25 kW or less) or $150 (26–95 kW); customer pays extra metering costs.
- Serves
- Rogers
Electrical Department approval required before installing. 918-341-2895.
- Serves
- Stephens
No published solar policy found.
Residential Service with Distributed Generation (R-DG)
One meter records power delivered and received; you are billed for net energy supplied over the billing period. Excess generation is not credited.
- Export credit
- None. Excess generation is not credited.
- Size limit
- 10 kW residential, 50 kW small commercial. Program capped at 1% of the city’s peak load; no new hookups once reached.
- Fees
- R-DG customer charge $30/month (commercial $65); permit fees.
- Serves
- Oklahoma
Owner-occupied homes only. Call Edmond Building & Safety (405-359-4780) to confirm applications are still open before signing a contract.
Behind the Meter Policy for Distributed Generation (2021)
Solar may offset your own usage behind the meter. The city does not credit or pay for any power sent to the grid.
- Export credit
- None
- Size limit
- 5 kW
- Fees
- Customer pays any studies or upgrades; liability insurance required.
- Serves
- Greer
- Serves
- Stephens
A distributed-generation rate exists (2016 resolutions) but the terms are not published online.
Distributed Generation Rules (Sec. 17-217)
The city credits power it receives from your system at a fixed rate, capped at your usage charge for that month.
- Export credit
- 3.6¢/kWh, capped at the month’s usage charge (2025 ordinance)
- Size limit
- No larger than your annual peak kW; over 15 kW must use at least 75% of output on site.
- Fees
- $500,000 liability insurance naming the city; customer pays any studies or upgrades.
- Serves
- Noble
One clause of the code says the city will not compensate generation, which conflicts with the 3.6¢ credit. Confirm with the city.
Residential Distributed Generation rate
Power you buy is billed at the DG energy rates; power you send to the grid is credited separately at a fixed rate. The meter does not run backward.
- Export credit
- 3.6¢/kWh fixed
- Fees
- Residential DG customer charge $47.28/month; customer pays any extra meter cost.
- Serves
- Kay
Renewable generation only; plan review and city inspection before the meter is set.
- Serves
- Mayes
No published solar policy found. 918-825-2100.
Net Energy Metering Distributed Generation Tariff (Rev. 5)
Solar is netted against usage each billing period. Net usage and net excess are both priced at the city’s wholesale energy rate, not the retail rate. Credits roll forward.
- Export credit
- Wholesale energy rate, set monthly (about 2.7¢/kWh in the tariff example)
- Size limit
- Lesser of 125% of last year’s peak load or 100 kW (2 kW minimum)
- Fees
- $65.04/month residential service availability fee (effective 1/1/2026); customer pays for 2 required meters; application fee.
- Serves
- Payne
Credits are capped at your highest monthly usage from the prior year. Contact the Electric Chief Engineer (405-533-8444) before contracting.
Reported in 2024: no metering for customers to earn credits, and the availability charge still applies even if solar covers all usage.
- Export credit
- None reported
- Serves
- Cherokee
No written policy found. TPWA asks that contractors contact them before installing.
- Serves
- Wagoner
No published solar policy found. 918-485-4586.
OG&E and PSO serve towns in most Oklahoma counties too. If your bill comes from one of them, see OG&E or PSO.
No utilities match. Try a town or county name, or call us and we’ll look it up.