Investor-owned utility · Oklahoma City

OG&E

Monthly net metering

NEBO (Net Energy Billing Option)

Solar and usage are netted over each monthly bill, separately for on-peak and off-peak hours, on a required time-of-use rate. Only a monthly surplus is credited, at avoided cost.

Export credit
Monthly surplus only: 30-day average SPP market price at the OG&E node, on-peak and off-peak. OG&E does not publish a monthly table.
Size limit
300 kW, and no more than 125% of your last 12 months’ peak demand
Fees
No solar-specific fee. Customer charge, riders and taxes still apply. Must be on a standard time-of-use rate.

Credits carry forward; payout available once over $100 or after 24 months. OG&E filed a rate case on 9/30/2026 (PUD 2026-000067) that could change these terms.

Investor-owned utility · Tulsa

PSO (Public Service Company of Oklahoma)

Monthly net metering

NEBO (Net Energy Billing Option)

Solar and usage are netted over each monthly bill, separately in on-peak and off-peak time-of-day buckets. Net usage is billed at your time-of-day rate; a monthly surplus is credited at avoided cost on the next bill.

Export credit
Monthly surplus only: SPP market average, e.g. 4.20¢ on-peak / 3.62¢ off-peak per kWh (July 2026)
Size limit
300 kW, and no more than 125% of annual peak demand
Fees
No solar-specific fee. Must be on a standard time-of-day rate. Non-fuel riders apply to all delivered kWh.

Requires a separate production meter. Alternative: sell output under PSO’s QF schedule (4.17¢ firm / 3.19¢ non-firm per kWh). Credits carry forward; payout over $100 or after 24 months.

Investor-owned utility · Joplin, MO

Liberty Utilities (Empire District)

Monthly net metering

Optional Net Energy Billing (Schedule NEB)

One meter runs backward and is netted each month. Net usage is billed at retail; a monthly surplus is credited at avoided cost and carried forward.

Export credit
Monthly surplus only: avoided energy cost (about 1.8–1.9¢/kWh plus the monthly fuel adjustment)
Size limit
300 kW, and no more than 125% of peak load
Fees
Monthly customer charge always applies.
Serves
Ottawa counties

Serves a small area of far northeast Oklahoma.

Electric cooperative · Cherokee

Alfalfa Electric Cooperative

Policy not published

Policy 511, Distributed Generation

Fees
Minimum monthly service charge applies.
Serves
Alfalfa, Woods, Grant, Garfield, Major counties

We could not find a published solar policy. Call the co-op, or ask us and we will check during design. (580) 596-3333.

Checked Nov 4, 2026 · details unconfirmedSource: aec.coop

Electric cooperative · Ozark, AR

Arkansas Valley Electric Cooperative

Policy not published
Serves
Le Flore, Sequoyah counties

Arkansas members follow Arkansas net-metering rules; we found no Oklahoma-specific terms. Call 1-800-468-2176.

Checked Nov 4, 2026 · details unconfirmedSource: avecc.com

Electric cooperative · Seminole

Canadian Valley Electric Cooperative (CVEC)

Monthly net metering

Net-metered solar account

Solar offsets usage over the billing period; CVEC buys back any surplus at its power supplier’s avoided cost.

Export credit
Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
Size limit
Short-form agreement up to 50 kW and 125% of peak load
Fees
Facilities charge on every meter. New residential demand charge ($1/kW in 6–9 am and 3–7 pm windows) since November 2025.
Serves
Seminole, Pottawatomie, Okfuskee, Hughes, Pontotoc, Lincoln, Okmulgee counties

Solar members connected by 11/1/2025 keep the old rate structure for 5 years. Requires a lockable disconnect within 10 ft of the meter.

Electric cooperative · Stillwater

Central Rural Electric Cooperative

Monthly net metering

Distributed Generation Rider

The meter runs backward and is settled each month (no annual rollover). A monthly surplus is credited at the power supplier’s avoided cost.

Export credit
Power supplier’s avoided cost (no number published)
Size limit
Net metering up to 300 kW; over 125% of peak load may be paid avoided cost only
Fees
Application fee; possible facilities charge; member pays for the remote-read link.
Serves
Payne, Logan, Lincoln, Noble, Pawnee, Creek, Oklahoma counties

Rider effective 12/31/2025. A separate “Power Export” option covers 25 kW–3 MW.

Electric cooperative · Hugo

Choctaw Electric Cooperative

No net metering · exports paid

Distributed Generation Rider 710

No netting. Solar offsets only what the home is using at that moment; exports are measured separately and credited at avoided cost.

Export credit
Avoided cost set by the co-op (wholesale rate plus a renewable credit component; no number published)
Size limit
Under 1 MW and no more than 125% of peak load
Fees
Application fee and possible facilities charges.
Serves
Choctaw, McCurtain, Pushmataha counties

Applies to agreements signed on or after 9/26/2023. Older systems under 25 kW keep monthly netting (Rider 710.1) until 2033 at the latest, with surplus given to the co-op.

Electric cooperative · Kingfisher

Cimarron Electric Cooperative

Monthly net metering

Policy 407, Distributive Generation Rider

The meter runs backward and is netted each month. A monthly surplus is credited at the power supplier’s avoided energy cost.

Export credit
Power supplier’s avoided cost (no number published)
Size limit
300 kW and no more than 125% of peak load
Fees
$15/month DG meter charge. No application fee under 300 kW (engineering fees possible).
Serves
Kingfisher, Canadian, Blaine, Logan, Garfield, Major counties

Electric cooperative · Binger

CKenergy Electric Cooperative

Monthly net metering

Rate 710, Distributed Generation

Solar up to the month’s usage is credited at the regular energy rate. Any monthly surplus is paid at a fixed excess rate on the next bill.

Export credit
3.7¢/kWh fixed (Feb 2023 manual; reviewed yearly)
Size limit
300 kW (larger case by case)
Fees
Application fee $175 (≤25 kW) or $275 (26–100 kW). Metering charge $20/month (≤25 kW) or $50/month (>25 kW).
Serves
Caddo, Kiowa, Washita, Custer, Grady, Canadian, Blaine, Comanche counties

Requires a second (production) meter; installer supplies the meter base.

Electric cooperative · Stigler

Cookson Hills Electric Cooperative

Policy not published
Serves
Haskell, Sequoyah, Muskogee, McIntosh, Cherokee, Le Flore, Pittsburg, Adair counties

We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 1-800-328-2368.

Electric cooperative · Walters

Cotton Electric Cooperative

No net metering · exports paid

Distributed Generation Guidelines

No net metering for any size. Solar offsets usage only as it happens; everything bought from the co-op is retail, and exports are credited monthly at avoided cost.

Export credit
Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
Size limit
300 kW and no more than 125% of peak load
Fees
Application fee $100 (under 300 kW) plus engineering; possible facilities and monthly DG charges.
Serves
Cotton, Comanche, Stephens, Jefferson, Tillman, Grady, Caddo, Kiowa, Carter counties

Requires separate production metering. The application asks for battery details (AC/DC coupling, transfer switch, protected-load panel).

Electric cooperative · Okmulgee

East Central Oklahoma Electric Cooperative

Monthly net metering

Distributed Generation Rider

The meter runs backward and is netted each month. A monthly surplus is bought at the power supplier’s avoided cost.

Export credit
Avoided cost (3.66¢/kWh when approved in Jan 2023; current value not published)
Size limit
300 kW and no more than 125% of peak load
Fees
Application fee: none under 5 kW, $50 for 5–100 kW. $5.83 per meter per month.
Serves
Okmulgee, Muskogee, Creek, Okfuskee, McIntosh, Wagoner, Tulsa, Hughes, Pittsburg counties

Battery backup requires a parallel blocking scheme.

Electric cooperative · Hollis

Harmon Electric Association

Policy not published
Serves
Harmon, Greer, Jackson, Kiowa, Beckham counties

We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 580-688-3342.

Electric cooperative · Cleveland

Indian Electric Cooperative

Monthly net metering

Distributed Generation Rider

Up to 25 kW, the meter runs backward and a monthly surplus is bought at avoided cost. Over 25 kW there is no netting: usage is billed at retail and exports are bought at avoided cost.

Export credit
Power supplier’s avoided cost (no number published)
Size limit
Net metering only up to 25 kW; rider covers up to 3 MW
Fees
$25/month customer charge over 25 kW; possible facilities charge and meter-read charge.
Serves
Pawnee, Osage, Creek, Tulsa, Payne, Noble counties

Electric cooperative · Blackwell

Kay Electric Cooperative

Policy not published
Fees
Minimum monthly fee applies.
Serves
Kay, Grant, Noble, Osage, Garfield counties

We could not find a published solar policy. Call the co-op, or ask us and we will check during design. (580) 363-1260.

Electric cooperative · Wilburton

Kiamichi Electric Cooperative

Monthly net metering

Distributed Generation Rider DG900

The meter runs backward and is netted each month. A monthly surplus is bought at the power supplier’s avoided cost. Systems over 125% of peak load sell all output at avoided cost.

Export credit
Power supplier’s avoided cost (no number published)
Size limit
300 kW and no more than 125% of peak load
Fees
DG facilities charge of $3.11 per kW of nameplate per month, on top of the regular facility charge.
Serves
Latimer, Pittsburg, Le Flore, Pushmataha, Atoka, Haskell counties

Battery storage counts as a qualifying facility. Member pays for the remote-read link.

Electric cooperative · Hulbert

Lake Region Electric Cooperative

No net metering · exports paid

Distributed Generation Rider (systems connected on or after 1/1/2018)

No net metering. Usage is billed as if there were no solar, and power sent to the grid is paid at the power supplier’s avoided cost.

Export credit
KAMO Power avoided cost (no number published)
Size limit
100 kW (larger case by case)
Fees
Application fee $25 (under 25 kW) or $50, plus engineering; $5/month if the meter must be read manually.
Serves
Cherokee, Wagoner, Muskogee, Mayes, Delaware, Adair counties

Systems connected before 2018 keep the older monthly-netting rider. Wagoner County requires a building permit number.

Electric cooperative · Vinita

Northeast Oklahoma Electric Cooperative (NOEC)

Monthly net metering

Net Metering

A two-way meter nets usage and solar over the billing month. If you produce more than you use, the energy charge is $0 and the surplus is credited at that month’s avoided cost.

Export credit
Published monthly: 9.34¢/kWh for Sept 2026 (2.7–5.8¢ most months of 2025–26)
Size limit
300 kW, and under 125% of recorded peak demand
Fees
Regular monthly service charge always applies. No solar-specific fee listed.
Serves
Craig, Delaware, Ottawa, Mayes, Nowata, Rogers counties

Electric cooperative · Sayre

Northfork Electric Cooperative

Policy not published

DG Rider (effective 9/1/2020)

Reported (2020) to use either net metering or avoided-cost purchase, depending on system size compared with your peak load. Current tariff not confirmed.

Export credit
Likely WFEC avoided cost (2.68¢/kWh for Oct 2026)
Size limit
300 kW (reported)
Serves
Beckham, Roger Mills, Washita, Custer, Greer counties

We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 580-928-3366.

Electric cooperative · Woodward

Northwestern Electric Cooperative

Monthly net metering

Distributed Generation Guidelines

A net meter is installed after inspection, and any overage is calculated monthly and paid at the current avoided cost.

Export credit
Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
Fees
None listed beyond the standard monthly charge.
Serves
Woodward, Harper, Ellis, Woods, Major, Dewey counties

Approval required before installing; engineering review and meter exchange before permission to operate. Also offers community solar shares.

Electric cooperative · Norman

Oklahoma Electric Cooperative (OEC)

Monthly net metering

Interconnection of Distributed Generation

Up to 25 kW, the meter runs backward and is netted each month at retail. Over 25 kW there is no netting: usage is billed at retail and exports are paid at the power supplier’s avoided cost.

Export credit
Over 25 kW: WFEC avoided cost (2.68¢/kWh for Oct 2026)
Size limit
Net metering up to 25 kW; larger systems up to 3 MW without netting
Fees
Application fee $25 (under 5 kW), $50 (5–100 kW) plus engineering; possible monthly charge over 25 kW.
Serves
Cleveland, Oklahoma, McClain, Pottawatomie, Grady, Canadian counties

Based on OEC’s 2021 manual; confirm it is still current.

Electric cooperative · Fayetteville, AR

Ozarks Electric Cooperative

No net metering · exports paid

Net Metering (systems installed after 9/29/2024)

Usage is billed at retail and each exported kWh is credited at avoided cost as a dollar credit that rolls over.

Export credit
Avoided cost of energy (filed yearly; no number posted)
Size limit
Under 1,000 kW
Serves
Adair, Cherokee, Delaware counties

Batteries must charge only from the solar and cannot export. Oklahoma members follow the same rules as Arkansas members.

Electric cooperative · Ada

People’s Electric Cooperative

Monthly net metering

Solar and usage are netted over each monthly bill. A monthly surplus is credited at avoided cost.

Export credit
Monthly surplus only: avoided cost, credited to your account (paid by check on request). Rate not published; for reference, power supplier WFEC's was 2.68¢/kWh for Oct 2026.
Size limit
300 kW, and no more than 125% of the location's highest historical demand
Fees
$100 application fee. No monthly solar fee and no separate DG meter.
Serves
Pontotoc, Seminole, Hughes, Coal, Johnston, Garvin, Murray, Pottawatomie counties

Requires a signed interconnection agreement, PEC approval and inspection, and a disconnect switch. Batteries aren't addressed in the policy: no export during outages; otherwise exporting is allowed, with the design subject to PEC approval. Interconnection contact: Buddy Wright, Director of Construction Design & Reliability, (580) 272-1556. Confirmed by email from PEC, Nov 9, 2026.

Electric cooperative · Marietta

Red River Valley Rural Electric Association

Monthly net metering

Policy 602, Interconnection of Distributed Resources

Systems are net metered over the month; a monthly surplus is credited at avoided cost.

Export credit
Power supplier (WFEC) avoided cost — 2.68¢/kWh for Oct 2026
Size limit
300 kW and no more than 125% of peak load; 50 kW and up moves to a standby rate
Serves
Love, Marshall, Carter, Bryan, Johnston, Jefferson counties

Electric cooperative · Mena, AR

Rich Mountain Electric Cooperative

Monthly net metering

Monthly kWh netting; a surplus carries forward, and $100+ of credit within 24 months can be paid out at avoided cost.

Export credit
Avoided cost on payouts only (no number posted)
Serves
Le Flore counties

Published terms are Arkansas rules; confirm Oklahoma terms at 479-394-4140.

Checked Nov 4, 2026 · details unconfirmedSource: rmec.com

Electric cooperative · Lindsay

Rural Electric Cooperative

Policy not published
Serves
Garvin, Grady, McClain, Stephens, Murray counties

We could not find a published solar policy. Call the co-op, or ask us and we will check during design. 405-756-3104.

Checked Nov 4, 2026 · details unconfirmedSource: recok.coop

Electric cooperative · Durant

Southeastern Electric Cooperative

Policy not published

2026 Distributed Generation Rider

Serves
Bryan, Marshall, Atoka, Johnston, Choctaw counties

A new 2026 rider is posted but we could not read it yet. 580-924-2170.

Checked Nov 4, 2026 · details unconfirmedSource: se-coop.com

Electric cooperative · Texarkana, AR

Southwest Arkansas Electric Cooperative

No net metering · exports paid

Non-Legacy Net Metering Tariff

Usage and exports are metered separately; each exported kWh is credited in dollars at avoided cost.

Export credit
12-month average market price, reset each February (no number posted)
Fees
$320 one-time fee for inverter systems 25 kW and under.
Serves
McCurtain counties

Published terms are Arkansas rules; Oklahoma terms not confirmed.

Checked Nov 4, 2026 · details unconfirmedSource: swrea.com

Electric cooperative · Tipton

Southwest Rural Electric Association

No net metering · exports paid

Distributed Generation Rider (Part VII, effective 5/1/2019)

No net metering. Everything you buy from SWRE is billed at your normal rate; power you send to the grid is credited on your bill at the power supplier’s avoided cost.

Export credit
Power supplier (WFEC) avoided cost, set periodically — 2.68¢/kWh for Oct 2026
Size limit
Under 3 MW. Systems over 25 kW also need a purchased power contract with SWRE’s power supplier.
Fees
25 kW and under: $10.92/month facilities charge; for General Service-eligible members, a minimum bill of at least $60/month. Member provides the communications link for remote meter reading; possible case-by-case facilities charge.
Serves
Tillman, Jackson, Kiowa, Comanche, Cotton, Greer, Harmon counties

Confirmed by SWRE by email on 11/4/2026, with the rider and interconnection contract. Systems 25 kW and under installed before 10/1/2015 keep legacy monthly net metering with excess given to the co-op. Interconnection contract required (long form above 5 kW). Contact: Barry Holt through January 2027, then Austin Huff (austinh@swre.com). Main office 580-667-5281.

Electric cooperative · Hooker

Tri-County Electric Cooperative

No net metering · exports paid

Distributed Generation Program

Solar offsets what you are using at the time. Exports recorded on a two-way meter are credited at avoided cost, not netted at retail.

Export credit
Monthly regional market price from Golden Spread (no number posted)
Size limit
1–300 kW, no larger than your service capacity
Fees
$250 co-generation meter installation; member pays for required protective equipment.
Serves
Texas, Beaver, Cimarron counties

Systems connected before June 1, 2017 keep their old agreement until 2029.

Electric cooperative · Collinsville

Verdigris Valley Electric Cooperative (VVEC)

Monthly net metering

Rate 35, Small Power Producers

Up to 25 kW, the meter runs backward and is netted each month; a surplus is credited at avoided cost. Over 25 kW there is no netting: exports are bought at avoided cost.

Export credit
KAMO Power avoided cost (no number published)
Size limit
Net metering up to 25 kW and under 125% of peak; Rate 35 covers up to 300 kW
Fees
Customer charge still applies; $25/month if read manually; producer pays for meters.
Serves
Tulsa, Rogers, Osage, Washington, Nowata, Pawnee counties

City-owned utility · Altus

City of Altus Electric

Policy not published
Serves
Jackson

No published solar policy found.

Checked Nov 4, 2026 · details unconfirmed

City-owned utility · Cushing

City of Cushing Electric

Policy not published
Serves
Payne

No published solar policy found.

Checked Nov 4, 2026 · details unconfirmedSource: ecode360.com

City-owned utility · Kingfisher

City of Kingfisher Electric

Policy not published
Serves
Kingfisher

Permit and inspection required; panels must be on the roof of a building owned by the electric customer (no ground mounts or street-visible yards). Export credit not published.

City-owned utility · Sallisaw

City of Sallisaw Electric

Policy not published
Serves
Sequoyah

No published solar policy found. 918-775-6241.

City-owned utility · Claremore

Claremore Electric

Monthly net metering

Rate Schedule RE, Net Metering and Distributed Generation

A two-way meter nets energy over the billing period. If you produce more than you use, you pay only the customer charge; the excess is not purchased.

Export credit
None. Monthly excess is not purchased.
Size limit
95 kW per location; program closes when total city solar reaches 995 kW.
Fees
Processing fee $100 (25 kW or less) or $150 (26–95 kW); customer pays extra metering costs.
Serves
Rogers

Electrical Department approval required before installing. 918-341-2895.

City-owned utility · Duncan

Duncan Public Utilities Authority

Policy not published
Serves
Stephens

No published solar policy found.

City-owned utility · Edmond

Edmond Electric

Monthly net metering

Residential Service with Distributed Generation (R-DG)

One meter records power delivered and received; you are billed for net energy supplied over the billing period. Excess generation is not credited.

Export credit
None. Excess generation is not credited.
Size limit
10 kW residential, 50 kW small commercial. Program capped at 1% of the city’s peak load; no new hookups once reached.
Fees
R-DG customer charge $30/month (commercial $65); permit fees.
Serves
Oklahoma

Owner-occupied homes only. Call Edmond Building & Safety (405-359-4780) to confirm applications are still open before signing a contract.

City-owned utility · Mangum

Mangum Utility Authority

No net metering · exports unpaid

Behind the Meter Policy for Distributed Generation (2021)

Solar may offset your own usage behind the meter. The city does not credit or pay for any power sent to the grid.

Export credit
None
Size limit
5 kW
Fees
Customer pays any studies or upgrades; liability insurance required.
Serves
Greer

City-owned utility · Marlow

Marlow Electric

Policy not published
Serves
Stephens

A distributed-generation rate exists (2016 resolutions) but the terms are not published online.

City-owned utility · Perry

Perry Municipal Authority

No net metering · exports paid

Distributed Generation Rules (Sec. 17-217)

The city credits power it receives from your system at a fixed rate, capped at your usage charge for that month.

Export credit
3.6¢/kWh, capped at the month’s usage charge (2025 ordinance)
Size limit
No larger than your annual peak kW; over 15 kW must use at least 75% of output on site.
Fees
$500,000 liability insurance naming the city; customer pays any studies or upgrades.
Serves
Noble

One clause of the code says the city will not compensate generation, which conflicts with the 3.6¢ credit. Confirm with the city.

City-owned utility · Ponca City

Ponca City Energy

No net metering · exports paid

Residential Distributed Generation rate

Power you buy is billed at the DG energy rates; power you send to the grid is credited separately at a fixed rate. The meter does not run backward.

Export credit
3.6¢/kWh fixed
Fees
Residential DG customer charge $47.28/month; customer pays any extra meter cost.
Serves
Kay

Renewable generation only; plan review and city inspection before the meter is set.

City-owned utility · Pryor

Pryor Municipal Utility Board

Policy not published
Serves
Mayes

No published solar policy found. 918-825-2100.

Checked Nov 4, 2026 · details unconfirmedSource: mubpryor.org

City-owned utility · Stillwater

Stillwater Electric Utility

Monthly net metering

Net Energy Metering Distributed Generation Tariff (Rev. 5)

Solar is netted against usage each billing period. Net usage and net excess are both priced at the city’s wholesale energy rate, not the retail rate. Credits roll forward.

Export credit
Wholesale energy rate, set monthly (about 2.7¢/kWh in the tariff example)
Size limit
Lesser of 125% of last year’s peak load or 100 kW (2 kW minimum)
Fees
$65.04/month residential service availability fee (effective 1/1/2026); customer pays for 2 required meters; application fee.
Serves
Payne

Credits are capped at your highest monthly usage from the prior year. Contact the Electric Chief Engineer (405-533-8444) before contracting.

City-owned utility · Tahlequah

Tahlequah Public Works Authority

No net metering · exports unpaid

Reported in 2024: no metering for customers to earn credits, and the availability charge still applies even if solar covers all usage.

Export credit
None reported
Serves
Cherokee

No written policy found. TPWA asks that contractors contact them before installing.

Checked Nov 4, 2026 · details unconfirmedSource: newson6.com

City-owned utility · Wagoner

Wagoner Public Works Authority

Policy not published
Serves
Wagoner

No published solar policy found. 918-485-4586.

What the plans mean

Same panels, different math.

Monthly net metering

Solar you send to the grid offsets what you pull back later in the same billing period, kWh for kWh. A leftover surplus at the end of the month is paid at the utility’s avoided cost, or not paid at all, depending on the utility.

No net metering · exports paid

You can connect solar to the grid, but there is no net metering. Solar first covers whatever the home is using at that moment. Power sent to the grid is paid at the utility’s avoided-cost or set rate (typically 2–4¢ per kWh), far below what you pay for power you buy.

No net metering · exports unpaid

You can connect solar to the grid, but there is no net metering and power sent to the grid earns nothing. Solar only pays off by covering what the home uses at that moment, so systems are sized to daytime use or set up not to export.

Policy not published

We could not find a current published policy. We check with the utility directly during design.

How this changes your system

Where there is no net metering, exported solar is worth much less than power you buy. We size those systems closer to what you use during the day and treat batteries as backup power, not a way to cut your bill. Under monthly net metering, sizing to your yearly use makes more sense.

Counties served are approximate, since co-op lines cross county boundaries. Rates and rules change. This page is a guide, not the tariff itself; always confirm with the utility’s current tariff. We verify your utility’s rules during design. Have a correction? Call 405-407-7789.