Investor-owned
OG&E
Monthly net meteringExports: Monthly surplus only: 30-day average SPP market price at the OG&E node, on-peak and off-peak. OG&E does not publish a monthly table.
Size limit: 300 kW, and no more than 125% of your last 12 months’ peak demand
Rate changes coming
2026 general rate review: asked +$23.88/mo, decision pending. Current status
Horseshoe Lake Unit 15 preapproval (755 MW gas plant), decision pending. Current status
Solar rules →Rate history →
City-owned
Edmond Electric
Monthly net meteringExports: None. Excess generation is not credited.
Size limit: 10 kW residential, 50 kW small commercial. Program capped at 1% of the city’s peak load; no new hookups once reached.
No open rate cases found.
Solar rules →Rate history →
Electric co-op
Oklahoma Electric Cooperative (OEC)
Monthly net meteringExports: Over 25 kW: WFEC avoided cost (2.68¢/kWh for Oct 2026)
Size limit: Net metering up to 25 kW; larger systems up to 3 MW without netting
No open rate cases found.
Solar rules →Rate history →
Electric co-op
Central Rural Electric Cooperative
Monthly net meteringExports: Power supplier’s avoided cost (no number published)
Size limit: Net metering up to 300 kW; over 125% of peak load may be paid avoided cost only
No open rate cases found.
Solar rules →Rate history →